Friday, June 22, 2012

Our new house

 The Japanese mat room(tatami)
 View of living room from tatami
 View of living room from front hallway
 View from living room through front hallway to kitchen
 Toilet room with small sink
 Full bathroom sink. The mirror has a touch button on it for light and anti fog
 Bathtub and shower in one room
 Laundry next to the kitchen between shower room and large bathroom sink

 Kitchen with eat in area and long desk for homework and computers
 View from kitchen sink to outside patio
 Side door to put garbage out and root storage in floor panel
 View of outside patio from kitchen
 Large window to patio from front entrance
 Sink at top of stairs for the toilet room
 View of kitchen from small hallway outside Master bedroom
 Master bedroom
 Hallway upstairs to kids bedrooms. Patio to hang clothes to dry.
 Lily and Evelyn's space of the large room
 View to Kol's side. We will put a partition between the two rooms
 Kol's side from his door
 Loft above from Kol's side
 Hannah's very pink room
 Loft in Hannah's room
Front entrance from hallway

 Outside of house
The Navy provides temporary furniture, while you wait for your household goods. Ours came yesterday, and I hope we don't have to live with it for too long. It takes about 2 months for your goods to be delivered from date of pick up, so we should only have about a month left.

No comments:

Post a Comment